FAQs

Frequently Asked Questions (FAQs)

To prepare an accurate quotation, we need three things:

  1. Drawing or picture of your sign (vector preferred: .eps, .cdr, .dwg, .ai etc.)
  2. Exact size of the sign
  3. Lighting effect (front-lit, side-lit, back-lit, or a combination)
    You may also choose lighting type from our catalog.

👉 After receiving this information, we will send your quotation within 24 hours.

If you’re unsure about specifications, just contact us — we’ll guide you through everything.

Yes.
A photo of the installation area helps us:

  • Understand the wall structure

     

  • Evaluate the building style

     

  • Recommend the best installation and fixing method

     

  • Production: 7 business days

     

  • Delivery (DHL): 3–5 business days
    ➡️ Total estimated time: around 12 business days

     

Lead time may vary depending on quantity and complexity.

Our signs include a 1-year limited warranty.
If any letter or module stops working within the warranty period, we will send you a free replacement.

We provide all required documentation:

  • 1:1 layout template

     

  • Wiring diagram

     

  • Installation instructions

     

  • We include:

    • Stud bolts

       

    • Washers

       

    • Nuts

       

    Everything needed for secure installation.

  • Yes, we ship worldwide through:

    • DHL (default)

       

    • UPS

       

    • FedEx

       

    • TNT

       

    Tracking number is provided immediately after shipment.

    • 50% upfront deposit before production

       

    • 50% remaining balance before shipment

       

    Payments accepted via Bank Transfer, PayPal, T/T, and Credit Card

Custom shop sign prices depend on fascia width, construction, illumination, materials, installation access and electrical work. A simple non-lit panel usually costs less than individually illuminated built-up letters. Ask for an itemised quotation showing artwork, manufacture, delivery, fixing, electrics, VAT and consent responsibilities before comparing suppliers.

Two signs that look similar in a mock-up may use different metals, acrylic thicknesses, LED modules, power supplies, coatings and fixings. Access equipment and wiring can also alter the installed price. Compare the complete specification, warranty exclusions and responsibilities rather than the headline total alone.

A good photograph can help communicate style and position, but may not provide a production-ready outline or accurate proportions. A sign maker may need to redraw the logo and confirm fonts, colours and dimensions before approval. Ask whether artwork reconstruction is included in the quote and proof process.

Traditional glass neon uses gas-filled glass tubing, while LED neon-style products use LEDs behind a diffuser to create a similar visual line. They differ in construction, power, maintenance and effects. Confirm exactly which product the quote covers and compare real photographs rather than relying on the word "neon".

Many illuminated signs require express advertisement consent, while some signs benefit from deemed consent under specific conditions. Listed buildings, conservation areas and local restrictions can change the position. Check with the local planning authority before ordering, and separately confirm any landlord, highway, listed-building or electrical approvals needed.

Electrical connections should be planned and installed by a suitably competent person using applicable UK electrical safety requirements. Ask whether the quote includes power supplies, isolation, cable routes, protective measures and commissioning. Do not assume that supplied wiring diagrams mean electrical installation is included in the sign price.

The sign quotation should clearly state whether safe access equipment, traffic or pavement permissions, evening work and disposal of the previous sign are included. These can be substantial extra costs for elevated fascia signs. Ask suppliers to compare a supply-only figure with a fully specified installed figure.

Begin the sign brief early, but avoid approving final manufacture until the mounting area, finished sizes and electrical routes are confirmed. Changes to cladding, shutters or ceiling heights can invalidate drawings. Ask for an opening schedule linking landlord permission, artwork approval, manufacture, delivery and installation.